|
|||||
|
|||||
Project OverviewAs Bend continues to grow, many of the changes brought about by this growth can be seen every day. However one result that goes mostly unseen is wastewater collection and treatment—and improvements required to the City's existing infrastructure to keep up with increased demand for wastewater services. These improvements include expansion of the complex network of underground infrastructure and above ground facilities that move wastewater throughout the City for safe and efficient treatment. In order to meet current and future wastewater needs of the City of Bend, the City is constantly assessing existing and projected demands on this system, and developing long-range plans to ensure its capacity meets this demand. One of the City's top priorities is in southeast Bend, where the load on existing wastewater infrastructure is at its current capacity. To that end, the City has looked at several options and has selected an approach to increase its ability to convey wastewater generated in Bend's southeast quadrant. This site is intended to serve the community as a resource for information
specific to the proposed wastewater solutions for southeast Bend. Gravity sewer 1. Gravity line down Murphy Road |
|||||